PRECONSTRUCTION · ESTIMATING · OWNER’S REP · GENERAL CONTRACTING
Preconstruction & Construction Management Services
Feasibility, estimating, scheduling, permitting and full construction management for residential and commercial projects across Florida.
Better Projects Start Before Construction
Most construction problems are decided before the first shovel hits the ground. Unclear scope, unrealistic budgets, missing engineering and late material orders cause the overruns and delays owners fear. DiBe Development & Construction prevents those problems with structured preconstruction and disciplined construction management.
Owners can hire us for preconstruction only, for full general contracting, or as an owner’s representative who manages the project on their behalf. Either way, you get clear numbers, real schedules and a team accountable for results.
What Our Construction Management Services Include
Planning, estimating, coordination and management from concept to closeout.
Consultation & Feasibility
Understanding what you want to build and whether it makes sense.
- Initial construction consultations on goals, scope and budget
- Property walkthroughs to evaluate existing conditions
- Preliminary feasibility assessments
- Preliminary renovation planning for occupied buildings
Scope, Estimating & Budgeting
Turning ideas into numbers you can rely on.
- Construction scope development and written work descriptions
- Conceptual construction cost estimates
- Detailed budgets by trade and project phase
- Value engineering of design and material options
- Subcontractor bid solicitation and comparison
Scheduling, Phasing & Logistics
Planning time, sequence and site access.
- Construction schedule development
- Phasing plans for work completed in stages
- Site logistics planning for deliveries, storage and equipment
- Access planning for constrained properties
- Long-lead material identification and procurement planning
Design & Permit Coordination
Getting from drawings to approved permits.
- Coordination of architects, engineers and consultants
- Constructability reviews
- Material and finish selection coordination
- Permit application coordination
- Utility service coordination before construction
- Preconstruction meetings with owners and project teams
General Contracting & Construction Management
Running the job from mobilization to handover.
- Full-service general contracting
- Owner’s representative services
- Residential and commercial construction management
- Subcontractor scheduling and coordination
- On-site supervision and quality-control inspections
- Progress monitoring, reporting and documentation photography
- Jobsite safety planning and inspection scheduling
Cost Control & Closeout
Protecting the budget and finishing strong.
- Project budget tracking
- Payment application review and coordination
- Change order preparation and management
- RFI, shop drawing and submittal coordination
- Material purchasing and delivery management
- Punch lists, closeout documentation and owner handover
- Post-construction warranty coordination
Preconstruction Only or Full Service
Some owners hire us only for preconstruction: a feasibility study, a detailed estimate, a schedule and a permit strategy they can take to lenders, partners or other builders. Others hire us to carry the project through construction as general contractor. Many start with preconstruction and continue with us once they see how organized the process is. There is no obligation either way, and the preconstruction work stands on its own.
Owner’s Representative Services
If you are working with an architect and another builder, or managing several projects at once, an owner’s representative protects your interests. We review budgets, schedules, pay applications and change orders, attend meetings, walk the site and report back to you in plain language. It is like having an experienced construction executive on your team without hiring one full time.
Reporting You Can Use
Every project we manage includes regular reporting: budget versus actual, committed costs, pending change orders, schedule updates, open RFIs and submittals, inspection results and progress photos. Reports are written for owners, lenders and investors, not just for contractors, so you always know exactly where the project stands.
Who We Serve
Developers
Feasibility, budgets and schedules that support financing.
Business Owners
Guidance through an unfamiliar process.
Homeowners
Clear scope and pricing before committing.
Investors
Reliable numbers for underwriting.
Lenders
Independent budget and progress review.
Associations
Phased planning for occupied communities.
Our Construction Management Process
01. Discovery
Goals, budget, site and constraints.
02. Feasibility
Zoning, utilities, costs and risks.
03. Estimate & Schedule
Detailed budget and master schedule.
04. Design & Permits
Team coordination and approvals.
05. Construction Management
Supervision, cost control and reporting.
06. Closeout
Punch list, documentation and warranty.
Managing Risk on Florida Projects
Florida projects face hurricane season, flood zone rules, long material lead times and busy permitting offices. Our preconstruction process plans for these risks with realistic schedules, early procurement, storm preparedness plans and permit strategies tailored to each county and city.
Why Choose DiBe Development & Construction
- Licensed Florida general contractor
- Commercial-grade project controls on every project
- Transparent budgets and change-order tracking
- Owner, lender and investor-ready reporting
- Residential and commercial experience
- Available for preconstruction only or full service
How to Request an Estimate
Getting started on your construction management project is simple. Here is what to expect when you reach out to our team.
1. Contact Us
Call (239) 414-3423 or use our contact form to tell us about your construction management project, location and timeline.
2. Site Visit & Review
We review your plans, photos or property in person, discuss goals and scope, and answer your questions.
3. Detailed Estimate
You receive a clear, written estimate with scope, line-item pricing, allowances and an expected schedule.
4. Schedule & Build
Once approved, we handle permits, order materials, schedule trades and keep you updated through completion.
Related Services
Commercial Construction
Ground-up office, retail, medical, industrial and mixed-use buildings.
Custom Homes & New Residential
Custom, spec, luxury, waterfront and multi-unit residential construction.
Tenant Improvements & Commercial Interiors
Restaurant, retail, medical and office build-outs and interior renovations.
Multifamily & Community Properties
Apartment, condo and HOA renovations, amenities and exterior repairs.
Demolition & Site Work
Full and selective demolition, lot clearing, grading, fill and drainage.
Storm, Flood & Fire Damage Reconstruction
Hurricane, flood and fire rebuilds and unfinished project completion.
See our full list of construction services or browse every page on our sitemap.
Service Areas
We provide construction management services throughout Southwest Florida, including Fort Myers, Cape Coral, Lehigh Acres, Naples, Estero, Bonita Springs and Punta Gorda, and in Southeast Florida, including Miami, Fort Lauderdale and West Palm Beach. Visit our service areas page for details.
What Is Preconstruction?
Preconstruction is the planning phase that happens before a construction contract is finalized and before work starts in the field. During preconstruction, the contractor works with the owner and design team to define scope, develop budgets, test design choices against cost, plan the schedule, identify long-lead materials and resolve problems on paper rather than on the job site.
Owners often think of construction cost as being set when bids come in. In reality, most of a project’s cost is determined by decisions made during design: building size, structural system, exterior materials, mechanical systems and site layout. Bringing a builder in during that stage gives the design team real pricing and constructability feedback while changes are still inexpensive to make.
What preconstruction produces
A typical preconstruction phase results in a defined scope, a budget tied to the drawings, a construction schedule, a list of long-lead items, a logistics plan, a permit strategy and a clear list of open decisions for the owner.
Preconstruction vs consulting
Preconstruction is usually the first phase of a project the contractor expects to build. If you want independent advice without a building contract, such as a review of another contractor’s bid, our construction consulting service is the better fit.
What Is the Difference Between a General Contractor, Construction Manager and Owner’s Representative?
These three roles are often confused, and the right choice depends on how much control, involvement and risk the owner wants.
General contractor
A general contractor typically prices completed drawings and agrees to build the project for that price. The contractor carries the risk of delivering the defined scope and manages all trades and subcontractors.
Construction manager
A construction manager joins during design, provides budgets and constructability input, and then manages construction, often with open-book cost tracking. Depending on the contract, the construction manager may also guarantee a maximum price once the design is sufficiently complete.
Owner’s representative
An owner’s representative works on the owner’s side, without building the project. The role includes reviewing budgets, schedules, pay applications and change orders, attending meetings and protecting the owner’s interests with the design team and contractor.
How Much Does Construction Management Cost?
Construction management fees are structured in several ways, and the right structure depends on the project and the level of service. We explain options plainly at the start so there are no surprises.
- Fixed fee for a defined preconstruction scope
- Percentage fee based on the cost of the work
- Fixed fee for construction management services
- Cost of the work plus a fee, with open-book accounting
- Guaranteed maximum price with shared savings provisions
- Hourly or retainer arrangements for owner’s representative work
Which Projects Benefit Most From Construction Management?
Construction management is especially useful when the project is complex, the budget is tight, the schedule matters, or the owner does not have in-house construction staff. Typical examples include ground-up commercial construction, multi-phase multifamily renovations, occupied tenant improvement programs, older properties needing building restoration, and raw land requiring extensive site development.
Projects with heavy systems work, such as restaurants, medical buildings and multifamily properties, also benefit from early MEP coordination, where licensed mechanical, electrical and plumbing contractors review layouts and equipment before drawings are finalized.
Preconstruction Checklist for Owners
These items are worth settling during preconstruction, before construction pricing is finalized.
- Clear project goals, priorities and budget limits
- Survey, geotechnical report and existing conditions documentation
- Flood zone, zoning and site plan requirements
- Utility availability and capacity
- Design drawings at a level suitable for pricing
- Structural system and exterior envelope decisions
- Mechanical, electrical and plumbing system selections
- Finish standards and owner-furnished items
- Long-lead equipment and material list
- Phasing and occupancy requirements
- Permit strategy and anticipated review timeline
- Contingency amount and how it will be managed
What Is Value Engineering?
Value engineering is the process of reviewing design choices to find options that deliver the same function and quality for less cost, or better performance for the same cost. Done well, it is not about cutting corners. It is about finding smarter ways to meet the owner’s goals.
Value engineering works best during design, when changes are simple to make. Once drawings are permitted and materials are ordered, the cost of change rises quickly, and savings often disappear in redesign fees and delays.
- Comparing structural systems, such as concrete block, tilt-wall or steel framing
- Simplifying building footprints and rooflines
- Standardizing window sizes and unit layouts
- Evaluating alternate roofing, flooring and finish materials
- Right-sizing mechanical and electrical equipment
- Optimizing site grading, fill and stormwater design
- Reusing existing systems in renovation projects
- Phasing work to match funding or leasing
Protecting long-term value
Some savings increase maintenance or operating cost over time. We point out those trade-offs so owners can decide based on the full life of the building, not just the initial price.
How Do Construction Managers Control Cost During the Build?
Once construction begins, cost control depends on disciplined tracking and clear communication. We compare committed costs to the budget by trade, document every change with its cost and schedule impact before it is approved, and report contingency use so the owner always knows where the project stands.
Pay applications are reviewed against work actually completed in the field, and lien releases are collected from subcontractors and suppliers as payments are made. On open-book projects, the owner can see subcontract amounts, invoices and the basis for every cost. This transparency is one of the main reasons owners and lenders choose construction management for larger projects.
- Budget vs committed cost reporting by trade
- Change order logs with pricing and schedule impact
- Contingency tracking
- Pay application review against field progress
- Lien release collection
- Schedule updates with look-ahead planning
How Does Florida’s Climate Affect Construction Planning?
Florida projects face conditions that should be planned for long before mobilization. Hurricane season runs through the summer and fall, and the rainy season brings near-daily afternoon storms that slow site work, concrete placement and roofing. Schedules that ignore these patterns tend to slip.
Good preconstruction planning sequences work so the building is dried in as early as possible, includes a hurricane preparedness plan for securing materials and equipment, and builds reasonable weather allowances into the schedule. Wind design under the Florida Building Code and FEMA flood zone requirements also affect structural design, openings, roofing and finished floor elevations, which in turn affect cost and lead times for impact-rated windows, storefronts and roofing materials.
Coastal and barrier island sites
Projects near the coast, on barrier islands or along canals may face higher wind design requirements, flood elevation requirements, salt air corrosion and limited access for deliveries. These conditions are addressed in the budget and logistics plan rather than discovered in the field.
Inland and rural sites
Inland sites can involve wetlands review, longer utility extensions, well and septic systems and significant fill. Early site investigation keeps these costs from surprising the owner.
What Does a Construction Schedule Include?
A useful construction schedule shows more than a start date and a finish date. It breaks the project into activities, shows the sequence and dependencies between trades, identifies the critical path, and marks key milestones such as permits, inspections, deliveries of long-lead items, dry-in, substantial completion and final completion.
During construction, we update the schedule regularly and share short look-ahead schedules with the field team, so upcoming inspections, deliveries and owner decisions are visible weeks in advance. When something slips, the schedule shows the impact and the options for recovering time.
- Design and permit milestones
- Procurement and long-lead deliveries
- Site work and foundations
- Structure and dry-in
- Rough-ins and inspections
- Finishes and equipment start-up
- Final inspections, punch list and closeout
How Is Trade Coordination Managed on a Complex Project?
Most building problems happen where one trade’s work meets another’s: where ductwork runs through framing, where plumbing passes through a slab, or where a window meets stucco and waterproofing. Construction management focuses heavily on those connections.
Before rough-in, we review layouts from the design team and licensed trade contractors to catch conflicts between structure, ductwork, piping, conduit and ceilings. During construction, we sequence concrete, framing and carpentry, mechanical, electrical and plumbing rough-ins and interior finishes so each trade has the access it needs and inspections happen on time. On residential and hospitality projects with amenities, pool construction by licensed pool contractors is coordinated with site, deck and utility work.
Construction Management Across Florida
We provide preconstruction and construction management throughout Southwest Florida, including Fort Myers, Cape Coral, Naples and Sarasota, and for commercial projects on the southeast coast from Miami to West Palm Beach. For residential owners, the same planning discipline applies to custom homes and large renovations. Each jurisdiction has its own permitting process and review expectations, which we account for in every schedule.
What Is a Guaranteed Maximum Price Contract?
A guaranteed maximum price, or GMP, contract sets a ceiling on what the owner will pay for a defined scope of work. The contractor or construction manager is reimbursed for the actual cost of the work plus a fee, up to that maximum. If costs exceed the GMP for the defined scope, the contractor is generally responsible for the overrun; if costs come in below it, the contract may return savings to the owner or share them.
A GMP is usually set once drawings are developed enough to price reliably. It works well for owners who want the transparency of open-book accounting combined with a firm limit on cost. The details that matter most are how the scope is defined, which allowances and contingencies are included, and how owner-requested changes adjust the maximum. We walk through each of those terms with owners before a GMP is signed, and owners who want an outside opinion on any contract structure can use our construction consulting service.
What Is Included in Project Closeout?
Closeout is where construction management finishes the job properly. It covers final inspections and the certificate of occupancy or completion, completion of the punch list, collection of final lien releases, and delivery of as-built drawings, warranties, equipment manuals and maintenance information. We also reconcile the final budget, close out contingency and allowances, and review building systems with the owner or facility staff so they are ready to operate the property from day one.
Construction Management and Preconstruction Services We Offer
Our construction management and preconstruction services cover every stage from feasibility through turnover. Owners can engage us as a full general contractor, as a construction manager, or for specific preconstruction and consulting tasks before a project is bid.
- General contracting services
- Construction project management
- Residential construction management
- Commercial construction management
- Design-build project delivery
- Preconstruction consulting
- Construction budgeting
- Construction cost estimating
- Construction scheduling
- Subcontractor management
- Construction procurement
- Construction bid preparation
- Permit application coordination
- Building inspection coordination
- Construction quality control
- Construction site supervision
- Value engineering
- Construction feasibility analysis
- Owner’s representative services
- Turnkey construction project delivery
Construction Management FAQs
Can I hire you only for preconstruction?
Yes. Feasibility studies, estimates, schedules and permit strategies are available as standalone services.
What is an owner’s representative?
An owner’s rep manages the project on your behalf, reviewing budgets, schedules, pay applications and change orders.
Do you provide estimates for lenders?
Yes. We prepare detailed budgets and schedules suitable for lender review.
Do you manage residential projects?
Yes. We manage both residential and commercial construction.
How do you control change orders?
Every change is priced, documented and approved in writing before work proceeds.
Do you coordinate architects and engineers?
Yes. We coordinate the full design team through permitting and construction.
What does a preconstruction phase cost?
Preconstruction is often priced as a fixed fee for a defined scope, and on some projects it is credited toward the construction contract. The structure is agreed upfront.
When should I bring a contractor into my project?
Ideally during schematic design, when building size, systems and materials are still flexible. Early involvement gives the design team real pricing before decisions are locked in.
Is an owner’s representative the same as a construction manager?
No. An owner’s representative advises and protects the owner without building the project, while a construction manager manages the construction work itself.
What is value engineering in construction?
It is a structured review of design and material choices to reduce cost or improve performance while still meeting the owner’s goals, ideally done during design.
How do you plan around hurricane season?
We sequence work to dry in the building early, include weather allowances in the schedule, and maintain a hurricane preparedness plan for securing the site, materials and equipment.
What is a GMP contract?
A guaranteed maximum price contract reimburses actual costs plus a fee up to an agreed ceiling for a defined scope, with savings below the ceiling often returned to or shared with the owner.
Start Your Project With a Plan
Tell us about your project and our team will follow up to discuss scope, budget and schedule. Estimates are clear, detailed and tailored to your property.