COMMERCIAL BUILD-OUTS · INTERIOR RENOVATIONS
Tenant Improvement Contractor for Commercial Build-Outs
Restaurant, retail, medical, salon, fitness and office build-outs, plus commercial interior renovations that get your doors open on time.
Build-Outs That Open on Time
When you sign a commercial lease, every week of construction is a week of rent without revenue. DiBe Development & Construction builds out commercial spaces quickly and correctly, coordinating design, permits, trades and inspections so you can open on schedule. We work for tenants, landlords and property managers across Southwest and Southeast Florida.
We handle first-generation build-outs in new shell space, second-generation renovations of existing spaces and white-box preparation for landlords marketing vacant units. From a small barbershop to a full-service restaurant or a multi-room medical suite, we plan the work around your lease dates, landlord requirements and business needs.
Our team understands the details that make commercial interiors work: accessible restrooms, fire-rated assemblies, kitchen exhaust and grease requirements, medical gas and plumbing coordination, data cabling, signage and branded finishes.
What Our Tenant Improvement Services Include
We build out and renovate commercial interiors for nearly every type of business.
Restaurant, Café & Bar Build-Outs
Food service spaces with complex plumbing, grease, exhaust and health department requirements.
- Restaurant tenant buildouts
- Coffee shop and bakery buildouts
- Bar and lounge buildouts
- Commercial kitchenettes and service counters
Retail, Showroom & Franchise
Branded spaces built to franchise standards and designed to sell.
- Retail tenant buildouts
- Commercial showroom buildouts
- Franchise location buildouts
- Checkout counters, fitting rooms and branding features
Medical, Dental & Wellness
Clinical spaces built to healthcare code, accessibility and infection-control standards.
- Medical office tenant improvements
- Dental office tenant improvements
- Physical therapy clinic buildouts
- Spa buildouts
Salon, Fitness & Personal Service
Spaces with specialized plumbing, flooring, lighting and acoustic needs.
- Salon and barbershop buildouts
- Fitness and yoga studio buildouts
- Coworking space buildouts
Office & Commercial Interior Renovations
Upgrades and reconfigurations for offices and customer-facing spaces.
- Office and professional service buildouts
- Lobby, reception and waiting area renovations
- Conference rooms, private offices and open-office layouts
- Breakrooms, training rooms and storage rooms
- Commercial restroom renovations
- Office partitions, demountable walls and suspended ceilings
- Commercial casework, countertops and wall protection
Landlord & Vacancy Work
Getting vacant space ready to lease and turning over second-generation space.
- White-box commercial space preparation
- Second-generation commercial space renovations
- Demising walls and code upgrades between tenants
First-Generation vs. Second-Generation Space
First-generation space is a brand-new shell with no interior improvements. These build-outs require everything from restrooms and HVAC distribution to lighting, ceilings, walls and finishes, but they offer complete design freedom. Second-generation space was previously built out for another tenant. Reusing existing restrooms, ductwork, plumbing and walls can lower cost and speed up opening, but the space must still be evaluated for code compliance, condition and fit with your business.
We walk the space with you before you sign the lease whenever possible, identifying what can be reused, what must be replaced and what code upgrades the change of use may trigger. That gives you a realistic budget and timeline before you commit.
Details That Pass Inspection the First Time
Commercial interiors are inspected for building, fire, accessibility, mechanical, electrical and plumbing compliance, and restaurants and medical spaces add health department and specialty inspections. Common issues include restroom clearances, door hardware, fire-rated corridors, emergency lighting and exit signage, kitchen hood clearances and grease interceptor sizing. We build these details correctly from the start and walk the space before inspectors arrive, which keeps re-inspections and delays to a minimum and gets your certificate of occupancy issued sooner.
Who We Serve
Business Owners & Tenants
Owners opening a new location or upgrading an existing one.
Landlords & Property Managers
White-box, turnover and landlord work delivered fast to reduce vacancy.
Franchisees
Brand-standard build-outs delivered on tight opening schedules.
Medical & Dental Practices
Clinical suites built to healthcare requirements.
Restaurant Operators
Food service spaces built for health department and fire inspections.
Brokers & Developers
Reliable build-out pricing that helps close leases.
Our Tenant Improvement Process
01. Space Walkthrough
We review the existing space, lease exhibits and landlord rules.
02. Scope & Budget
Clear scope and line-item estimate, with value options.
03. Design & Permits
Drawings coordinated and permits submitted quickly.
04. Procurement
Long-lead items like hoods, storefront and fixtures ordered early.
05. Build-Out
Framing, MEP, ceilings, finishes and millwork on a tight schedule.
06. Inspections & Opening
Final inspections, certificate of occupancy and punch list.
Working Around Leases, Landlords and Operating Businesses
Tenant improvement projects come with rules that ground-up projects do not. Landlords often require approved contractors, insurance certificates, after-hours work for noisy tasks and coordination with building systems like fire alarms and sprinklers. We work within those requirements and communicate directly with property managers so approvals do not slow the job.
For renovations in occupied buildings, we plan phased work, temporary walls, dust control and after-hours scheduling so neighboring tenants and your own staff can keep operating.
Why Choose DiBe Development & Construction
- Fast turnaround schedules built around your lease
- Experience with health, fire and accessibility inspections
- Direct coordination with landlords and property managers
- Clear pricing for tenant allowance negotiations
- Clean, safe jobsites in occupied buildings
- Licensed Florida general contractor
How to Request an Estimate
Getting started on your tenant improvement project is simple. Here is what to expect when you reach out to our team.
1. Contact Us
Call (239) 414-3423 or use our contact form to tell us about your tenant improvement project, location and timeline.
2. Site Visit & Review
We review your plans, photos or property in person, discuss goals and scope, and answer your questions.
3. Detailed Estimate
You receive a clear, written estimate with scope, line-item pricing, allowances and an expected schedule.
4. Schedule & Build
Once approved, we handle permits, order materials, schedule trades and keep you updated through completion.
Related Services
Commercial Construction
Ground-up office, retail, medical, industrial and mixed-use buildings.
Preconstruction & Construction Management
Estimating, scheduling, permitting, owner’s rep and project management.
Multifamily & Community Properties
Apartment, condo and HOA renovations, amenities and exterior repairs.
Demolition & Site Work
Full and selective demolition, lot clearing, grading, fill and drainage.
Whole-Home Remodeling
Gut renovations, layout changes, investor rehabs and specialty rooms.
Storm, Flood & Fire Damage Reconstruction
Hurricane, flood and fire rebuilds and unfinished project completion.
See our full list of construction services or browse every page on our sitemap.
Service Areas
We provide tenant improvement services throughout Southwest Florida, including Fort Myers, Cape Coral, Lehigh Acres, Naples, Estero, Bonita Springs and Punta Gorda, and in Southeast Florida, including Miami, Fort Lauderdale and West Palm Beach. Visit our service areas page for details.
Tenant Improvement and Commercial Interior Services
Every build-out is different, but most combine several of the services below. We coordinate the full scope as the general contractor, with mechanical, electrical, plumbing and fire protection work performed by licensed trade contractors under our MEP coordination.
- Office tenant build-outs
- Retail tenant improvements
- Restaurant tenant build-outs
- Medical office tenant improvements
- Dental office build-outs
- Salon build-outs
- Barbershop build-outs
- Fitness studio build-outs
- Commercial kitchen build-outs
- Coffee shop build-outs
- Convenience store build-outs
- Warehouse office build-outs
- Commercial interior demolition
- Commercial space reconfiguration
- Office partition construction
- Commercial restroom construction
- ADA commercial accessibility upgrades
- Retail storefront renovations
- Commercial occupancy conversion projects
- Commercial interior finishing
What Is a Tenant Improvement?
A tenant improvement, often called a TI or build-out, is the construction work that turns leased commercial space into a usable space for a specific business. It can range from new paint, flooring and lighting in a second-generation office to a complete restaurant build-out in a raw shell with new restrooms, grease interceptor, hood system and storefront.
Tenant improvements are usually governed by both a construction contract and the lease. The lease often defines who pays for what, what the landlord delivers, what approvals are required, and what the space must look like when the tenant leaves. Reading those provisions before design starts avoids surprises later.
Who pays for a tenant improvement?
It depends on the lease. Many leases include a tenant improvement allowance paid by the landlord, with the tenant responsible for costs above that amount. Some landlords build the space themselves, and some leases deliver space as-is. We can price the work so both parties understand what the allowance covers.
Do tenant improvements need a permit?
Most do. Work that affects walls, exits, plumbing, electrical, mechanical systems, fire protection or accessibility generally requires a permit from the local building department. Cosmetic work such as paint or carpet may not, but the rules vary, so we confirm permit requirements for each project.
How Much Does a Commercial Build-Out Cost?
Build-out cost depends on the condition of the space you lease and what your business needs from it. We provide line-item estimates once we have walked the space and reviewed your layout, but the factors below drive most of the price.
- Starting condition: raw shell, vanilla shell or second-generation space
- Use type: restaurants and medical uses typically carry more systems work than offices or retail
- Plumbing: new restrooms, sinks, floor drains and grease interceptors
- HVAC: added tonnage, new ductwork, exhaust and make-up air
- Electrical: service capacity, panels, dedicated circuits and lighting
- Fire protection: sprinkler head relocation and alarm devices
- Accessibility upgrades required when an existing space is altered
- Finish level: flooring, ceilings, millwork, fixtures and lighting design
- Storefront, signage and exterior changes requiring landlord approval
- After-hours work requirements in occupied centers
How Long Does a Tenant Build-Out Take?
Most tenant improvement schedules have three parts: design and permit drawings, permit review, and construction. Simple office or retail refreshes can move quickly, while restaurants and medical spaces generally take longer because of equipment, inspections and health or agency approvals.
Lease timing matters. Many leases give the tenant a limited rent abatement period for construction, so we build the schedule backward from the opening date and identify long-lead items such as rooftop units, hood systems, storefront glass and specialty equipment as early as possible.
Tenant Improvement Checklist Before You Sign a Lease
Many build-out problems start before construction, at the lease stage. Walking a space with a contractor before you sign can reveal costs that are not obvious from a listing.
- Confirm the zoning and building allow your intended use
- Check electrical service size and available panel capacity
- Check HVAC tonnage, age and condition
- Locate existing plumbing, sewer and grease interceptor connections
- Confirm restroom count and accessibility condition
- Ask whether the space is sprinklered and how the alarm system is monitored
- Review landlord work letter, allowance and approval requirements
- Understand restoration obligations at the end of the lease
- Ask about construction hours, deliveries and access rules
- Confirm signage and storefront rules
Related Trades in a Build-Out
A good build-out depends on clean coordination between trades. Our framing and carpentry crews handle walls, blocking and soffits; our interior finishes team handles drywall, ceilings, flooring and paint; and concrete work covers slab trenching and patching for new plumbing. Older centers sometimes need facade or structural repairs as well, which our building restoration group can address. If you are still evaluating spaces or reviewing a landlord’s proposal, construction consulting can help you understand the real cost before you commit.
For new buildings rather than interior space, see our commercial construction page, and for larger programs managed from early design, see preconstruction and construction management.
What Makes Restaurant Build-Outs Different?
Restaurants are among the most demanding tenant improvements. They combine heavy plumbing, ventilation, electrical and fire protection work with health department requirements and tight opening deadlines. Planning the kitchen layout around existing utilities is often the single biggest cost decision.
Typical restaurant scope includes a grease interceptor, floor sinks and drains, hand sinks, a commercial kitchen hood with fire suppression, make-up air, walk-in cooler pads, dedicated equipment circuits, and durable cleanable finishes. Plumbing is performed by licensed plumbing contractors such as HomeFlow Plumbing, with hood, fire suppression, HVAC and electrical work handled by licensed trade contractors that we coordinate.
Second-generation restaurant space
Taking over a former restaurant can save money when the hood, interceptor and restrooms are reusable. A condition assessment before signing tells you what can stay and what must be replaced.
Equipment coordination
Equipment schedules from your kitchen designer or supplier drive plumbing, electrical and gas rough-ins. Finalizing that list early keeps rough-in work accurate.
What Do Medical and Dental Build-Outs Require?
Medical and dental suites need more plumbing, more electrical and more careful layouts than standard offices. Exam rooms, sterilization areas, operatories and labs each have specific sink, power, data and ventilation needs. Some equipment, such as imaging, may require structural support, shielding or dedicated circuits as specified by the equipment vendor and design professionals.
Accessibility is especially important in healthcare spaces, from accessible routes and restrooms to door clearances and reception counters. We coordinate with your architect and equipment vendors so that rough-ins are placed correctly the first time and inspections go smoothly.
Tenant Improvements Across Our Service Areas
We build out commercial interiors throughout Lee, Collier, Charlotte and Sarasota counties, including shopping centers and office parks in Fort Myers, Estero, Naples and Cape Coral. On the southeast coast, we handle commercial interiors in markets such as Miami, Boca Raton and West Palm Beach. Each jurisdiction has its own permitting process, and landlords often have their own tenant construction requirements, which we account for in every schedule.
How Do Landlord Approvals Work on a Build-Out?
Most commercial leases require the landlord to approve the tenant’s construction drawings, contractor and insurance before work begins. Shopping centers and office buildings often publish tenant construction criteria that cover working hours, roof penetrations, sprinkler shutdowns, deliveries, dumpsters and signage.
We prepare the submittals landlords typically request, including drawings, schedules, certificates of insurance and contractor license information, and we coordinate any work that touches base building systems such as roofs, fire alarms, sprinkler mains or shared utilities. Clear communication with property management keeps approvals moving and avoids stop-work requests from the center.
Landlord work vs tenant work
Leases often split the scope: the landlord may deliver a demised shell with utilities, while the tenant handles interior finishes. When both are under construction at once, coordinating the two scopes avoids rework and missed inspections.
What Do I Need to Open After Construction?
Construction ends with final inspections and a certificate of completion or occupancy, depending on the jurisdiction and scope. Some uses also require separate approvals, such as health department inspections for food service, fire marshal inspections, or state agency licensing for certain healthcare uses.
Before opening, most businesses also need signage permits, low-voltage and security systems installed, furniture and equipment set, and utility accounts transferred. We build those steps into the closeout schedule so the space is ready for staff training and opening day, not just inspection day.
- Final building, mechanical, electrical, plumbing and fire inspections
- Certificate of completion or occupancy
- Health or agency inspections where required
- Punch list completion and final cleaning
- As-built drawings and equipment manuals
- Warranty documentation and lien releases
Should I Renovate My Current Space or Relocate?
Businesses that are outgrowing a space, or whose space no longer fits how they work, often weigh a renovation against a move. A renovation avoids moving costs and keeps your address, but may require phased work around operations. Relocating can give you a better layout and fresh systems, but brings a new lease, a full build-out and moving downtime.
We can price both scenarios side by side: a phased renovation of your current suite and a build-out of a prospective new space. Comparing real construction numbers, schedules and disruption, rather than rough guesses, usually makes the decision much clearer. Factors worth weighing include remaining lease term, landlord willingness to contribute an allowance, the age of existing HVAC and electrical systems, parking and visibility, and whether your current space can meet accessibility requirements once it is altered.
Explore Related Pages
- Commercial Interiors Contractor: office, medical, retail and restaurant interiors across Florida
- Commercial Construction & Build-Outs in Cape Coral: ground-up commercial buildings and build-outs in Cape Coral
Tenant Improvement FAQs
How long does a tenant build-out take?
It depends on size, complexity and permitting. Simple office or retail spaces move faster than restaurants or medical suites. We provide a schedule with your estimate so you can plan your opening.
Can you help me understand my tenant improvement allowance?
Yes. We provide detailed pricing early so you can negotiate your allowance and lease terms with real numbers.
Do you build restaurants?
Yes. We build full restaurant buildouts, including kitchen exhaust, grease interceptors, walk-in coolers and health department coordination.
Do you work in occupied buildings?
Yes. We plan phasing, dust control and after-hours work to minimize disruption to other tenants.
Do you do white-box work for landlords?
Yes. We prepare vacant spaces with base restrooms, HVAC, lighting and finished walls so they are ready to lease.
Do you handle permits?
Yes. We coordinate drawings and submit and manage the permit through approval.
What is the difference between a vanilla shell and a white box?
The terms vary by landlord, but a vanilla shell or white box usually includes finished walls, a basic ceiling, lighting, HVAC and a restroom, ready for tenant finishes. A cold or gray shell typically has little more than the structure and utilities stubbed in.
Can I walk a space with DiBe before signing a lease?
Yes. A pre-lease walkthrough helps identify plumbing, electrical, HVAC and accessibility work that could affect your budget before you commit.
Can construction happen while neighboring tenants stay open?
Yes. We plan noise, dust control, deliveries and after-hours work so surrounding businesses can keep operating.
Who handles plumbing, electrical and HVAC in a build-out?
Licensed trade contractors perform that work. DiBe coordinates them as the general contractor, manages permits and inspections, and keeps the schedule aligned with other trades.
How long does landlord approval take?
It varies by landlord. Some approve drawings within days, while larger centers may take longer. Submitting complete drawings, insurance and contractor information at once usually speeds review.
Ready to Build Out Your Space?
Tell us about your project and our team will follow up to discuss scope, budget and schedule. Estimates are clear, detailed and tailored to your property.